Construction of the Northbridge Park fishing pier and kayak launch dock continues on the Ashley River in Charleston, South Carolina.  The fixed pier walkway construction stretches waterward and will lead to a 15′ x 30′ pier head.   The gathering area portion of the pier that will lead to the gangway and floating canoe / kayak launch dock has been completed.  The handrails will be installed later in the project and will consist of stainless steel cables between the aluminum posts that are now in place.  The top cap on the handrails are the same composite material that is used for the decking.

3-24-14 004   3-24-14 016

 

3-24-14 020   3-24-14 022