Dewees Island Loading Ramp Extension

JGT was commissioned by the Dewees Island Property Owners Association to permit, design and observe construction of an extension to the existing loading ramp on the Island. Dewees Island is a barrier island north of the Isle of Palms that is only accessible by boat. Supplies are brought over by landing craft that use the [...]

Kiawah Island Bulkhead Completed

The Kiawah Island Bulkhead Replacement is complete. Replaced a failed timber bulkhead. Approximately 250 linear feet of steel sheet pile bulkhead with a helical tie-back system. The maximum exposed height of the was 19 feet. The Timber cladding and top-cap are only to cover up the steel sheets to meet the Property Owners Association requirements. [...]

Governor’s Park Boardwalk Completed

The Governor’s Park Boardwalk on Daniel Island, SC has been completed. JGT permitted, designed and oversaw construction of the 320′ long, 10′ wide board walk. Constructed with an aluminum substructure, composite decking and timber handrails, the boardwalk connects the existing trails with the new City of Charleston Park on Daniel Island. The boardwalk features two [...]

Kiawah Bulkhead-Timber Cladding goes up.

The timber cladding is beginning to be installed on the JGT permitted and designed steel bulkhead on Kiawah Island.

Subscribe to the comments on this post Print for later Tell a friend

Kiawah Island Bulkhead Replacement Progress

More sheets and anchors are being installed at the JGT permitted and designed bulkhead replacement on Kiawah Island. The timber beams for the timber cladding are being installed along the steel mounting bands.