Residential Bulkhead

JGT was engaged to permit, design, bid and provide construction administration for a residential bulkhead with rip rap toe protection along a tributary of Beresford Creek, located on Daniel Island in the City of Charleston, Berkeley County, South Carolina.

The project consisted of construction of approximately 50 linear feet of new bulkhead along the existing [...]

Residential Pier Head, Floating Dock and Floating Wave Attenuator

This residential project is located on the Wando River in Mount Pleasant, South Carolina adjacent to the Charleston Harbor. The project consists of a 4′ x 44′ extension to an existing 585′ fixed pier walkway, a 20′ x 30′ covered fixed pier head with a 3′ x 35′ gangway leading to a 10′ x 66′ [...]

Little Oak Island Causeway Bulkhead Project

Little Oak Island is a private residential community located in the Town of Folly Beach in Charleston County, South Carolina. The only path of ingress and egress from the island is via an approximately 2,300 foot long causeway. The causeway, which is located adjacent to the marshes of the Folly River, had been experiencing erosion [...]